Xcel Energy High Bridge Balance of Plant Piping and Equipment Installation
OWNER: Xcel Energy Inc.
Market |
Power plant
LOCATION:
St. Paul, MN
STATUS:
Completed February 2008
PROJECT DURATION:
Nine months
Highlights
Played an integral role in converting coal-fired plant to natural gas-fired plant.
Installed more than 50,000 feet of plant piping, from the main steam to noncritical small bore, as well as all the associated equipment.
Coordinated and installed more than 3,500 engineered pipe supports.
Employed and managed up to 140 craftspeople at the project’s peak.
Helped the plant significantly reduce air pollution while generating more the twice the power of the old plant.
Met all deadlines.