  • Xcel Energy High Bridge Balance of Plant Piping and Equipment Installation
Previous 1/1 Next

Xcel Energy High Bridge Balance of Plant Piping and Equipment Installation

OWNER: Xcel Energy Inc.
Market | Power plant
LOCATION:

St. Paul, MN

STATUS:

Completed February 2008

PROJECT DURATION:

Nine months

Highlights

  • Played an integral role in converting coal-fired plant to natural gas-fired plant.
  • Installed more than 50,000 feet of plant piping, from the main steam to noncritical small bore, as well as all the associated equipment.
  • Coordinated and installed more than 3,500 engineered pipe supports.
  • Employed and managed up to 140 craftspeople at the project’s peak.
  • Helped the plant significantly reduce air pollution while generating more the twice the power of the old plant.
  • Met all deadlines.
Next Project
Next Project
View Project List

Services

Project management, Pipe fabrication and installation, Equipment installation,

Safety Performance

©2023 Pioneer Power, Inc.