Xcel Energy High Bridge Balance of Plant Piping and Equipment Installation

OWNER: Xcel Energy Inc.
Market | Power plant
LOCATION:

St. Paul, MN

STATUS:

Completed February 2008

PROJECT DURATION:

Nine months

Highlights

  • Played an integral role in converting coal-fired plant to natural gas-fired plant.
  • Installed more than 50,000 feet of plant piping, from the main steam to noncritical small bore, as well as all the associated equipment.
  • Coordinated and installed more than 3,500 engineered pipe supports.
  • Employed and managed up to 140 craftspeople at the project’s peak.
  • Helped the plant significantly reduce air pollution while generating more the twice the power of the old plant.
  • Met all deadlines.
Next Project
Next Project
View Project List

Services

Project management, Pipe fabrication and installation, Equipment installation,

Safety Performance

©2025 Pioneer Power, Inc.

2500 Ventura Drive | Woodbury, MN 55125

651-488-5561

  • Home  |  
  • Contact Us  |  
  • Privacy  |  

Pioneer Power has joined Limbach, a leading building system solutions firm that specializes in revitalizing and maintaining building systems in existing facilities, ensuring your buildings are always ready to perform when it matters most.

Please note that your services and contacts will remain the same, but you will now have access to additional resources as part of the Limbach family.

Learn More About Our Services Contact Our Team Learn More About the Acquistion