Pioneer Power > Projects > Central Corridor Light Rail Transit
  • Central Corridor Light Rail Transit
  • Central Corridor Light Rail Transit
  • Central Corridor Light Rail Transit
Previous 1/3 Next

Central Corridor Light Rail Transit

OWNER: Metropolitan Council
Market | Industrial
LOCATION:

St. Paul, MN

STATUS:

4th Street Advanced Utilities was completed November 2010; Civil East Construction was completed September 2012

PROJECT DURATION:

Two years for each

Highlights

  • Relocated and installed 6,550 feet of chilled water piping (ranging in size from 6 to 24 inches in diameter) and 12,245 feet of hot water piping (ranging in size from 3 inches to 16 inches in diameter), as well as numerous critical overnight building tie-ins for District Energy St. Paul.
  • Subcontracted and managed the civil/excavation, electrical, insulation, and NDE (nondestructive examination) portions of the project.
  • Met all milestones and completion dates.
Next Project
Next Project
View Project List

Services

Project management, Pipe fabrication and installation,

Safety Performance

Zero OSHA recordable injuries or lost time accidents.